AD number | Document | Issue number | Effective date | Status |
---|---|---|---|---|
1 | High Pressure Turbine Wheel - CANCELLED | 9/2004 | Cancelled | |
2 | Full Authority Digital Engine Control | 9/2004 | Active | |
3 | High Pressure Turbine Wheel | 10/2004 | Active | |
4 Amdt 1 | Starter Adapter Drain | 8/2008 | Active | |
5 | Engine Oil Tank Ventilation System | 9/2008 | Active | |
6 Amdt 2 | High Pressure Turbine Stage 2 Wheels - CANCELLED | Cancelled | ||
2009-24-04 | Fan Spinner | Active | ||
2011-22-03 | Compressor Wheel Inspection | Active | ||
2013-26-06 | High Pressure Turbine Stage 2 Wheels | Active | ||
2015-02-08 | Reduction of the Approved Life Limits of Turbine Wheels | Active | ||
2017-11-05 | High-Pressure Turbine (HPT) Wheel - Revised Life Limits | Active | ||
2017-26-06 | Fan Wheel Life Limit | Active | ||
2018-17-04 | 1st Stage Gas Generator Turbine Wheels or 1st Stage High-Pressure Turbine Wheels - Replacement | Active | ||
2020-16-13 | 3rd-Stage Compressor Wheel | Urgent |